Installation and disassembly of construction hoist

Release time: 2021-05-29 Visited: 426

Preparation before installation

1 The installation site should have sufficient power supply, and must be equipped with a power box dedicated to the elevator. Each cage should be controlled by a switch. The current of the power supply fuse should be referred to the elevator performance parameter table;

2. The dedicated power box on the construction site should be directly introduced from the transformer room on the construction site, and the distance should not exceed 25m. Generally, one cable is used, or each cage can be connected by one cable. The cable section specification is larger than that of the main cable of the cage. One size bigger. If the distance exceeds 25 meters, the cross-sectional area of the cable should be appropriately increased;

3. Appropriate lifting equipment and installation tools should be available

4. There should be roads and sites for transporting and stacking elevator parts;

5. The user should make the basis as required

6. Determine the connection plan between the attached wall frame and the building, and prepare embedded parts or fixed parts as needed

7. According to user needs, bring your own platform accessories, such as bridge boards, safety railings, platform landing doors, etc.

8. According to relevant regulations and requirements, set up a grounding device to ensure that the grounding resistance is not greater than 4Ω;

9. According to relevant regulations and requirements, the maximum deviation of the site power supply voltage is ±5%, and the power supply is not less than the total power of the motor

10. If the construction site is powered by a generator, it must be equipped with reactive power compensation equipment to ensure power quality

11. The construction site should be equipped with a suitable leakage protection switch.

Parts that need to be provided by the user

1. The lift foundation made according to the requirements, and some 2~12mm thick steel gaskets, used to pad into the chassis and adjust the verticality of the rail frame;

2. Dedicated power box and connecting cable equipped as required;

3. A cable with a suitable specification is used to connect the dedicated power box and the power box of the elevator. The length is generally not more than 25 meters, and the shorter is better.

4. Select the connection scheme of the attached wall frame, prepare the connecting bolts and embedded parts

5. In addition to the special tools provided with the machine, the user needs to prepare a set of installation tools.

Installation safety requirements

1. The installation site should be cleaned up and enclosed with sign poles, etc., and non-workers are forbidden to enter

2. Prevent objects from falling above the installation site, and safety nets should be added when necessary

3. During the installation process, the installation must be carried out by a professionally qualified installer, and at the same time, a dedicated person shall be responsible for the unified command

4. When the lift is running, the head and hands of the personnel must not be exposed outside the safety fence of the cage, let alone outside the driver's cab

5. Don't forget to tighten the link bolts of the standard section and the wall bracket

6. If someone is working on the rail frame, attached wall frame or under the cage, never start the lift. When the cage is raised, it is strictly forbidden to enter the outer cage.

7. All parts on the hanging cage must be placed stably, and the safety fence must not be exposed

8. When using booms for installation, overloading is not allowed. The booms are only used to install or disassemble parts of the elevator, and not for other purposes.

9. Do not move the cage when there are hanging objects on the boom

10. Installation personnel should follow the safety requirements for aerial work, including wearing helmets, safety belts, and non-slip shoes. Do not wear loose clothes and wear work clothes to avoid being caught in moving parts and causing safety accidents.

11. When operating the elevator during installation, the operating box must be brought to the top of the hanging cage, and operation in the hanging cage is not allowed

12. Before starting the hoisting cage, a comprehensive inspection should be carried out to eliminate all hidden dangers of insecurity.

13. During installation and operation, it must be loaded according to the rated load of the elevator, and overload operation is not allowed

14. Installation operations cannot be carried out during thunderstorms, snowy days, or severe weather with wind speeds exceeding 13 m/s

15. When the elevator is running, firstly ensure that the grounding device is connected to the metal structure of the elevator, and the grounding resistance is not greater than 4Ω

16. The numbers of the transmission trolley and the cage must be the same

17. All parts must use the original parts provided by our company, otherwise there will be safety hazards

18. Without the permission of the company, the electrical wiring of the lift shall not be changed

19. Installation is strictly prohibited at night or after drinking

20. The verticality of the guide rail frame must be checked as required for each installation of the attached wall

21. Lubricate as required after installation

久久国产精品高潮一级毛片 | 91精品国产高清久久久久久g | 国产一区三级在线观看免费 | 精品久久久久久久 | 美女自慰喷水高清免费网站 | 特黄a又粗又大又黄又爽A片麻豆 | 无套内射在线观看 | 17c久久精品国产亚洲 | 1000部啪啪毛片免费看 | 红桃黄色商品在线观看 | 日韩亚洲精品视频 | 狠狠躁91人妻二三区 | 成年人黄色蜜桃网站 | 性生大片免费看A一级 | 久久久久无码精品国产sm果冻 | 小黄书成人版免费视频网站 | 黄色网址在线免费观看 | 两个人爽爽视频免费观看 | 亚洲一区在线观看视频 | 少妇做爰免费视频播放 | 天天射天天搞天天干绿帽淫妻 | 亚洲无马黑料在线观看 | 26uuuuuu| 三级片在线观看网站网址大全 | 亚洲高清国产自产AV | 国产精品自拍第一页 | 欧美午夜福利在线观看 | 国产又粗又大又黄的视频 | 91人妻边做边打电话AⅤ | 国产又粗又爽又黄高潮视频 | 我要的网站欧美性欧美性欧美性欧美性 | 色狠狠色噜噜AV天堂五区消防 | 国产囗爆吞精一区二区 | 精品高潮呻吟久久av | 国产无码精品在线播放 | 国产成人精品免费视频 | 婷婷在线观看视频 | 久久久久久无码午夜精品直播 | 中文字幕日韩电影 | 久久99精品亚洲国产 | 9国产精成人午夜在线 |